ABB Power & Control for Japan’s Wind Turbine Installation Vessel
ABB will equip Japan-built self-elevating wind turbine installation vessel with its power and control technologies.
The company said Tuesday that the 28,000-GT jack-up unit on order from builder Japan Marine United Corp, and due for delivery to Shimizu Corp. in 2022, will feature ABB’s closed ring configuration for the vessel’s dynamic positioning (DP) operations This will enable safe and predictable performance with high tolerance in the event of the power plant fault.
Tags: ABB, Aurora News, Aurora Project, Japan, Offshore Jack-Up Vessel, Offshore Wind Vessel, Ray Dean